•  
  • HOME
  • COMPANY
  • SERVICES
  • PROJECTS
  • NEWS
  • CONTACT US
LOG IN
  • CURRENT PROJECTS
  • PAST PROJECTS

BREWSTER WASTEWATER TREATMENT PLANT RECONSTRUCTION, BREWSTER, NY

Owner: Village of Brewster
Engineer: J. Robert Folchetti & Associates, LLC
Contract Amount: $13,414,915
Completion Date: September 2007

Construction of a new, advanced tertiary treatment plant with a design average flow of 240,000 gallons per day including:

  • Comminutor
  • Aeration tanks
  • Grit tank and grit separation equipment
  • Primary settling tanks
  • Rotating biological contactors
  • Rapid mix tank
  • Flocculation tank
  • Final settling tanks
  • Traveling bridge filters
  • Membrance microfiltration units
  • Chlorine tank
  • Dechlorination tank
  • Post aeration tanks
  • Gravity sludge thickener
  • Dry pit
  • Odor control units
  • Non-potable water system
  • Chemical storage and feed systems
  • Headworks building
  • Filtration building
  • All related architectural, structural and electrical instrumentation
  • HVAC and plumbing
  • Mechanical and site work
  • Demolition of existing Wastewater Treatment Plant

©2012 Carlin Contracting Co., Inc. all rights reserved.
Sitemap

PAST PROJECTS

MORE PROJECTS