LIME AND FLUORIDE SYSTEMS IMPROVEMENTS, PHILIP J. HOLTON WATER PURIFICATION PLANT, SCITUATE, RI

Owner: Providence Water Supply Board
Engineer: Maguire Group Inc.
Contract Amount: $2,267,958
Start Date:

Removal and replacement of the current lime feeder and transfer equipment and the current fluoride feed system to include:

  • Process equipment, pipe and materials demolition
  • Cleaning of bulk storage silos & bins and associated materials disposal
  • Preparation and abatement areas, cleaning of abatement areas and packaging and storage of waste for off-site disposal
  • Concrete and masonry renovations
  • Lime silo stair access stairway construction
  • Lime pneumatic pressure conveyance system, including blowers, bulk silo discharge system, duct collectors/filters, piping, bends and valves
  • Pre-engineered blower building construction
  • Fluoride storage and feed system including storage tanks, pumps, fill station, containment dike, piping and valves
  • Emergency equipment
  • Electrical instrumentation
©2012 Carlin Contracting Co., Inc. all rights reserved.